Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts

Saturday, October 18, 2008

Construction - Week Ten

The little wicker chair is in front of my door;
this view shows Eclectic (with the OPEN sign to draw attention
down the street where it's blocked off) and further down is Fusion Glass Studio.

As you can see, the revitalization is coming right along. We now have extended sidewalks, garden areas and a lovely crosswalk made to resemble cobblestone.

Each place on the sidewalk where an orange cone is will soon be a light post that is fashioned historically. I will have one right in front of my store which will wonderful for late night shoppers.

My orange cone needed a Halloween flair so I glued a black felt jack-o-lantern on it. It gets a bit of attention from passer-by's.
The street will be paved once the entire project is completed. What a great day that will be! The street in front of Red Books & Chairs is currently open while the crew works on the other end of the street so you can park close - you'll just have to u-turn to get out.


See you soon!

Thursday, September 4, 2008

Construction - Week Four


The constant rain this week has halted work on the street. You can see by the photo that my little 'OPEN' sign shines bright in spite of the current demolitions. I'm not going to lie to you, my faithful reader, business has been affected. It's difficult to see that the stores on the construction block are open because your car cannot get close enough to see the signs, but WE ARE OPEN! So, grab your pals and spend the afternoon or 1st Friday together on C-Street. We'll be open until 10:00 pm (September 5th).

Thursday, August 21, 2008

Construction: Week Two

Since Red Books & Chairs opens mid-week (Wed - Sat); I've been arriving to the store with surprises each week. I park behind the row of buildings that my store is located in. Since I only have a back dock door I cut through my pal, Erin's glass studio (Fusion). I walked out of her building yesterday onto NO sidewalk. Maybe you can tell by the pictures that there is chat where sidewalk use to be then a drop off. I haven't seen the C-crew (Construction crew) for a couple of days. Maybe they're resting up to get it all done next week!




C-Street Revitalization in Progress